Status: awarded
Henkels & McCoy, Inc.$66895500.43
HMS Construction Inc.$72160144.00

To view or download the procurement documents you must be logged in. 
Please login or subscribe using the form on this page.

Addenda 

The following Addenda have been provided on dates as listed below. Download all files to each addendum to view the full description of the amended content. Files are made available in the Dropbox downloader.

Addendum 1: Posted Wednesday, August 30, 2023

Addendum 2: Posted Tuesday, September 12, 2023

Addendum 3: Posted Tuesday, September 26, 2023

Addendum 4: Posted Wednesday, October 18, 2023

Addendum 5: Posted Monday, October 23, 2023

1.0 Overview

The Project relocates utilities in advance of the City Center Guideway and Stations construction work. It provides utility relocation construction services for electrical utilities on behalf of Hawaiian Electric Company, Inc. (“HECO”) throughout the City Center segment of the Honolulu Rail Transit Project (“HRTP”). The construction services to be provided include, but are not limited to, permanent and temporary electrical utility relocation, cabling and cutover, close coordination with the CCUR IV contractor that will be providing the infrastructure for the electrical utility, coordination with HECO on the energization of the electrical utility, and installation of permanent utility poles, equipment, electrical gear and transformers, removal of existing utility poles, pole foundations to a minimum of five feet below finished grade and cabling, building connection work, and other utility installation support structures. Other construction work in the vicinity of the Project has been completed or is under construction by HART or other Authorities Having Jurisdiction (“AHJ”). For information to Bidders, Reference Materials include selected drawings from the CCUR IV contract.